Bond Project Update

Westwood Intermediate School & Westwood Middle School
 
At Westwood Intermediate, the summer project included new air handling systems in all of the classrooms to provide a healthier, more consistent air exchange. The district also abated asbestos floor tiles in the classrooms and installed carpeting. Thirty-five year-old casework was also replaced in the classrooms. The district upgraded the plumbing and replaced rusted, hollow metal windows. Finally, the district made the bathrooms fully handicap accessible.
 
While Westwood Middle School had no work done this summer, the summers of 2008 and 2009 will be very, very busy.
 
Multimedia

 
 
Construction Bids

 
 
 
Building Highlights

  • Auto drop off will be separate from the bus drop off. Driving lanes could be widened to provide for two-way traffic. The new configuration will provide greater safety.
  • Additional classrooms New service entrance for the kitchen
  • Lunchroom expanded by 50 percent, ceiling raised
  • Modifications to gymnasiums and academic areas
  • Current cafeteria will be converted into classroom space
  • Many windows will be replaced
  • Installation of larger louvers will provide more fresh air Roof will be replaced in its entirety
  • Westwood Intermediate and Westwood Middle Schools will share the same entrance area, but each will have separate and distinct reception and office areas
  • service corridor will be incorporated between the two gyms
  • Lockers will be incorporated inside classrooms
  • Media center expansion
  • Deferred maintenance items will include:
    • refurbished mechanical systems
    • windows replaced when needed
    • new carpet in classrooms
    • asbestos abatement
    • program incorporated to clean duct work
    • plumbing and piping replacement
    • new air handling systems
    • incorporate same color
      palate in all schools
  • Summer 2007 construction costs at the Westwood complex: $9.8 million
Construction Documents

 
Phase Chart
 
Westwood Complex Phase Chart
 
Site Plan
 
Westwood Complex Site Plan
 
New Entry
 
Westwood Complex Main Level Floor Plan
 
New Cafeteria
 
Westwood Complex Main Level Floor Plan
Main Level - Overall
 
Westwood Complex Main Level Floor Plan
 
Main Level - New Addition
 
Westwood Complex Main Level Floor Plan
 
New combined WWI and WMS entrance
 
Westwood Complex Artist's Conception of New Combined WWI and WMS Entrance